Sayalar Wind Farm
Project Information
Project Title: Sayalar 30.4 MW Wind Farm Projekt
Methodologies: ACM0002/version 6, Sectoral Scope: 1
Projekt Description:
The project involves the development of a 30.4 MW onshore wind farm in Manisa Province, Sayalar District in Turkey. The project is constructed and operated by Demirer Holding, under the name “Doğal Enerji Üretim A.Ş.” and consists of 38 wind turbines of 800 kW, supplied by Enercon GmbH. 29 units of Enercon E44 are installed at an altitude of 55m, 4 units are installed at an altitude of 55.6 m and 5 units of Enercon E48 are installed at an altitude 64.6 m hub height. The proposed project activity includes the construction of 30 km of new transmission line to establish a connection between the proposed project and the national grid. The project will be connected to the 154 kV high-voltage transmission line at Izmir transformer station. The Sayalar Wind Farm will generate approx. 116 GWh/year which is delivered to the Turkish national grid. The estimated emission reductions amount to approx. 85,035 tCO2-eq/year. Because of the significant contributions of the project activity to the region’s sustainable development is the project activity designed as Voluntary Offset Project under the Gold Standard.
Host Country: Turkey
Insert Day: August 6th 2007
Open for comments until: closed