Mare Manastir Wind Farm
Project Information
Project Title: Mare Manastir 39.2 MW Wind Farm Project - Turkey
Methodologies: ACM0002/version 6, Sectoral Scope: 1
Projekt Description:
The project involves the development of a 39.2 MW onshore wind farm in the region of İzmir-ÇeÅŸme-Manastır in Turkey. The project is constructed and operated by Demirer Holding, under the name “Mare Manastır Rüzgar Enerjisi Santralı Sanayi ve Ticaret Anonim Åžirketi” and consists of 49 wind turbines, supplied by Enercon. 32 units are installed at an altitude of 55m and 17 units are installed at 50m altitude. The proposed project activity includes the construction of 700 m of new transmission line to establish a connection between the proposed project and the national grid. The project will be connected to the 154 kV high-voltage transmission lines between the Alaçatı and Urla transformer stations. The Mare Wind Farm will generate 129 GWh/year which is delivered to the Turkish national grid. The estimated emission reductions amount to 88,960 tCO2-eq/year. Because of the significant contributions of the project activity to the region’s sustainable development is the project activity designed as Voluntary Offset Project under the Gold Standard.
Host Country: Turkey
Insert Day: 24th May 2007
Open for comments until: closed